Scaffolding truss
This scaffolding truss size is 1.35m*2m*4m with one stand board, it is the size that most welcomed by our customers. This scaffolding truss is suitable for outdoor building construction, wire connection and maintenance, etc. The wheels carry by it brings great convenience for movement and the high quality frame ensures the safety of high-altitude work.



Specifications:
1.Material:Aluminum Alloy+Plywood working platform.
2.Height:4M,6M,8M.10M,12M.
3.Size:2*0.75M,2*1.35M.
4.Truss surface: Anti-skid surface treatment.
5.Easy to assemble.Layer truss consist of Pillar, Horizontal Pipe, Diagonal Pipe, Adjustable Base, Joint pipe. Its construction.
6. Any customized size is welcome.
Scaffolding truss applications:
Layer truss is mainly used for lifting the Line Array Speaker.lifting LED screen, Advertisement Picture. Widely used in different outdoor shows and events.
Feature 1 | Equipped with high strength casters, movable. |
Feature 2 | The whole structure adopts “building block” combination design, without any safety tools. |
Feature 3 | A member of a scaffold. It is strictly forbidden to seriously drop or bump the accessories in the process of transportation and storage. When lapping and disassembling, it is forbidden to drop from the height. When disassembling, it should be operated sequentially from the top down. |
Feature 4 | General scaffolding must be built according to the scaffolding safety technical operation specifications, for the height of more than 15m tall scaffolding, there must be design, calculation. Only after detailed drawing, construction plan, examination and approval of the technical person in charge at the next higher level and written disclosure of safety technology can the construction be completed. |

All of our products are TUV-certified, high-strength 6061-T6 or 6082-T6 aluminum alloy materials. The factory has always put quality and product safety in the first place, so it has won praises from domestic and foreign customers.


The company has 15 years of rich experience in managing production and production of scaffolding truss technical staff, the company aluminum products welding and iron products welding technical staff of about 25. More than 50 percent have more than 10 years of welding experience, and 30 percent have more than 5 years of welding experience. We will better deal with the production schedule and quality details of good scaffolding.
After we receive the scaffolding truss order, we strictly control the production quality details. Before each order is loaded in the factory, we will conduct quality inspection, calibration and load bearing test. Weld inspection.




8x18x3m and 9x18x3m transparent tent

8x18x3m and 9x18x3m transparent tent

8x18x3m and 9x18x3m transparent tent

8x18x3m and 9x18x3m transparent tent

8x18x3m and 9x18x3m transparent tent

8x18x3m and 9x18x3m transparent tent

8x18x3m and 9x18x3m transparent tent

8x18x3m and 9x18x3m transparent tent

8x18x3m and 9x18x3m transparent tent

8x18x3m and 9x18x3m transparent tent

8x18x3m and 9x18x3m transparent tent

8x18x3m and 9x18x3m transparent tent

Part.1
Part.2


Part.3

FEATURES 1
FEATURES 2


FEATURES 3
FEATURES 4
